Are you planning to use pile construction technology on your site? This is an excellent solution and, in some cases, the only possible one! But that is a subject for another article. Here, we will look at some of the finer points of installing helical piles and supports.

First, you need to decide whether to do everything yourself or hire contractors. Installing them yourself is possible and, if successful, may reduce your costs. But is it worth leaving things to chance and saving money on the foundation when the rest of the construction and the future performance of your building depend on it? Our advice is therefore to buy piles from a pile manufacturer (in our case, WINTTEK) or its dealers. Ideally, choose installers from among their regular partners (dealers): this will shorten the work schedule and provide additional assurance of quality. Why?

Piles supplied by authorized installers may cost a little more, but they are more likely to be of the proper quality.
Professionals have the necessary qualifications and, perhaps even more importantly, experience.
Manufacturers generally monitor their partners' work, with all the resulting benefits (after all, working with shoddy contractors would, at the very least, be foolish!).
They have specialized installation equipment and accessories that enable them to screw a pile in to the design depth. Doing this manually requires a crew of at least 5 people, which is unattractive to installers because it reduces their profit.
Products are generally already in stock or can be manufactured quickly.
They will resolve any problems that arise during installation (and who never has problems?) promptly and at minimal cost.
They have firm rates rather than rough estimates, which generally tend to increase. If unforeseen site conditions (specialists should warn you in advance that this can happen) require design adjustments and increase the price, they will make the changes promptly and explain the increase.
They will offer optional additional services, in particular a trial installation, which provides a reasonably objective assessment of the soil at relatively low cost and helps ensure the building's future performance.
The piles will be installed so that the building can be positioned on the foundation in accordance with the design (house plans and similar documents will make the installers' job considerably easier), without subsequent adjustments and their associated costs.
They will help you select piles to suit your design.
Competent installers can carry out the full scope of work even in an open field without electricity or other utilities. They have everything they need and will arrive fully equipped!
Second, there are several points you should know.

Unscrupulous installers have several ways of reducing the cost of piles and the foundation as a whole to win your business. Check their proposal as thoroughly as you can:

a) Measure the pipe wall thickness. Such installers may, for example, pass off a 3,5 mm wall as 4 mm on a 108 pile, or persuade the customer that 3,5 mm is cheaper and still provides more than enough load-bearing capacity. This deception could cost you dearly! A pile with a 3,5 mm pipe wall will reach failure (failure of the upper shaft end) much sooner than one with a 4 mm wall, meaning that it will not reach the bearing soil layers. The result is foundation settlement over time.

b) A pile length of 2,5 m is specified without a soil investigation, a trial installation, or even simply asking the customer questions (see item 8). The justification is that these are the most commonly used piles, that they have installed them in the area before, and similar assurances.

c) The number and diameter of piles may be understated. If you know the weight of the building and the distributed load along its load-bearing walls (per 1 linear m), you can readily compare these with the installers' proposal. Otherwise, the foundation designer should show you the calculations and explain their basis.

d) The piles you have “chosen” have been screwed into the ground along their entire length. It seems the installers have done their job. Yet they have failed to mention that the pile has not reached the bearing layer. In this case, extensions should be used and installation should continue. Only then will the foundation's load-bearing capacity match the design value. Of course, this increases the project cost, which does not suit builders who won the job by being “cheaper than the competition”. The result is settlement. This is another reason to consider a trial installation!

  1. No pilot holes! This means drilling to a depth of 1-1,5 m. It makes the installers' work much easier but is a serious violation of the installation method!
  2. The pile length must, at a minimum, allow the pile to be installed below the frost line.
  3. All services must be covered by a contract and a certificate of completed work.
  4. A so-called pile group must be formed to withstand higher horizontal loads on the building.
  5. Do not neglect additional bracing between piles (diagonal braces) if the support platform will be more than 0,8 m above ground level, or concrete filling of the pile interiors (to protect against oxygen and water).
  6. Use our recommendations to question your prospective installers, and make sure you receive comprehensive answers. Only then decide whether to work with them. Given the nature of this work, your decision must be informed: by trying to save money, you assume certain risks in full.
  7. Pile installation generally takes 1-2 days, excluding additional work such as bracing, painting, and so on.
  8. Any information about the site, soils, cellars, wells, and similar features is valuable to installers because it helps them make the right recommendations.
  9. When choosing a contractor, do not overlook word of mouth, which is often more reliable than impressive websites and enthusiastic promises from sales managers.