UDS Screw Pile Extensions

Used when screw piles need to be extended directly at the installation site.

This becomes necessary if no geological surveys or trial installation have been carried out and, during installation, the selected pile length proves insufficient to support the design load on the screw pile foundation. In this case, extending the piles is the only correct solution. WINTTEK uses diamond-shaped plates to improve the alignment of the extensions and strengthen the welded joint.

The final cost of the piles and installation is calculated after the work has been completed. This naturally increases the cost of the foundation. It is therefore more sensible to order a trial installation and use its results to decide which type of foundation to choose.

Shaft diameter: 57, 76, 89, 108, 133 mm
Length: from 1000 mm
Copyright MAXXmarketing GmbH
JoomShopping Download & Support